Cadarache will be the site of the ITER fusion project – how long ago was it?
The background
On June 28, 2005, the international decision was made to build the ITER fusion test reactor in Cadarache, southern France. France and Japan in particular had previously applied for the location. The agreement cleared the way for a major project that will show whether controlled nuclear fusion can be technically used as the basis for future energy supply. Unlike today's nuclear power plants, light atomic nuclei are fused instead of heavy ones being split. Germany is involved through European participation; Research institutions and industry contribute knowledge and technology. However, ITER is not a commercial power plant and is not intended to supply electricity to the grid. The choice of location was therefore an important step for international fusion research, not a breakthrough to already available fusion energy.